Above Ground Weighbridges

Above Ground Weighbridges

 

Above Ground Weighbridges typically occupy the weighbridge deck, ramps and load cells above ground level.

Benefits/Advantages of Above Ground Weighbridges:

  • Least expensive weighbridge option.
  • Least site preparation required before construction.
  • Most common type of weighbridge supplied & installed across Australia.
  • Easy to clean and inspect.
  • Requires minimal drainage or in most cases not required at all.

 

Disadvantages of Above Ground Weighbridges:

Involves the largest site footprint of all the options – Having 5m long Ramps at either end, or in some situations even longer ramps if the ground slopes away from the weighbridge.